+966-533428898

    Solar Power Systems

    Sourced and supplied across Saudi Arabia

    Saudi Arabia has some of the best solar resource on earth and two conditions that quietly erode it, and both belong in the design rather than in the disappointment afterwards. The first is heat: a module's rated output is measured at a cell temperature of twenty-five degrees, and every degree above that costs output according to the module's temperature coefficient, so an array on a roof at midday in July is producing meaningfully less than its nameplate. The second is dust. Soiling on the glass reduces yield continuously between cleans, and in this region the cleaning interval is a design parameter with a real cost attached, not a maintenance afterthought — which is also why tilt angle and access for cleaning matter. Then say which kind of system it is: an off-grid array with batteries is a different design and a different approval path from a grid-connected one, which needs the utility involved before anything is ordered.

    What to state in your enquiry

    The more of this you send, the closer the first quotation lands.

    System typeOff-grid with battery, grid-connected, or hybrid
    Load or target outputDaily energy in kWh, or the array size in kWp
    Site locationNeeded for irradiance, ambient temperature and soiling rate
    Module temperature coefficientOutput loss per degree above the rating condition
    Soiling and cleaningPlanned cleaning interval and the water and access available
    MountingRoof, ground-mount or carport, and the tilt and orientation
    Structural and wind loadingDesign wind speed at the site
    Inverter typeString, central or hybrid, with the MPPT count required
    Battery storageAutonomy in days, and the chemistry required
    Utility approvalRequired before any grid-connected system is ordered
    ProtectionDC combiner, string fusing, surge protection and isolators
    MonitoringString-level monitoring and the reporting required
    ScopeSupply only, or supply with installation and commissioning

    Standards we supply against

    • IEC 61215
    • IEC 61730
    • IEC 62109-1
    • IEC 62109-2

    Which type do you need?

    Select one and it travels with your enquiry. Not sure? Leave it and describe the application instead.

    We source to specification. Send your requirement and we will come back with options, lead time and pricing.